Changes between Version 20 and Version 21 of IPSLCMIP6
- Timestamp:
- 03/30/16 17:38:25 (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
IPSLCMIP6
v20 v21 23 23 for a full description of the experimental design. 24 24 25 Using IPSL model, it is planned to perform the three experiments from Tier1 for a total of 210 years of simulations .25 Using IPSL model, it is planned to perform the three experiments from Tier1 for a total of 210 years of simulations (280 years if control has to be rerun). 26 26 The main difficulty is to have 3D tendencies in the ocean as diagnostics outputs of the simulations. NEMO will be hopefully equipped with a key to allow such a requirement. 27 27 == GeoMIP ==