Changes between Version 20 and Version 21 of IPSLCMIP6


Ignore:
Timestamp:
03/30/16 17:38:25 (8 years ago)
Author:
oboucher
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • IPSLCMIP6

    v20 v21  
    2323for a full description of the experimental design. 
    2424 
    25 Using IPSL model, it is planned to perform the three experiments from Tier1 for a total of 210 years of simulations. 
     25Using IPSL model, it is planned to perform the three experiments from Tier1 for a total of 210 years of simulations (280 years if control has to be rerun). 
    2626The main difficulty is to have 3D tendencies in the ocean as diagnostics outputs of the simulations. NEMO will be hopefully equipped with a key to allow such a requirement. 
    2727== GeoMIP ==