Changes between Version 189 and Version 190 of PerformancesIPSLCM6
- Timestamp:
- 01/08/19 14:54:55 (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
PerformancesIPSLCM6
v189 v190 15 15 Voir : http://www.prace-ri.eu/prace-project-access/ 16 16 17 * Call 1818 * Opening of the call: 4 September 201819 * Closing of the call: 30 October 2018, 10:00 Brussels time20 * Allocation period: From 2 April 2019 to 1 April 202021 17 * Call 19 22 18 * Opening of the call: 5 March 2019 23 19 * Closing of the call: 30 April 2019, 10:00 Brussels time 24 20 * Allocation period: From 1 October 2019 to 30 September 2020 25 * Pour mémoire : Call 17 26 * Clos le 2 mai 2018 21 * Pour mémoire : 22 * Call 18 23 * Opening of the call: 4 September 2018 24 * Closing of the call: 30 October 2018, 10:00 Brussels time 25 * Allocation period: From 2 April 2019 to 1 April 2020 27 26 * Disponible sur irene : 28 27 || System || Architecture || Site (Country) || Core Hours (node hours) || Minimum request || 29 || Irene (Joliot Curie) – SKL || Bull Sequana X1000 || GENCI@CEA (FR) || 1 34 million (2.8million) || 15 million core hours ||28 || Irene (Joliot Curie) – SKL || Bull Sequana X1000 || GENCI@CEA (FR) || 142 million (3 million) || 15 million core hours || 30 29 31 30 == Demandes d'heures A6 : date limite 7 février 2019 11h ==