Changes between Version 189 and Version 190 of PerformancesIPSLCM6


Ignore:
Timestamp:
01/08/19 14:54:55 (5 years ago)
Author:
mafoipsl
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • PerformancesIPSLCM6

    v189 v190  
    1515Voir : http://www.prace-ri.eu/prace-project-access/ 
    1616 
    17  * Call 18 
    18    * Opening of the call: 4 September 2018 
    19    * Closing of the call: 30 October 2018, 10:00 Brussels time 
    20    * Allocation period: From 2 April 2019 to 1 April 2020 
    2117 * Call 19 
    2218   * Opening of the call: 5 March 2019 
    2319   * Closing of the call: 30 April 2019, 10:00 Brussels time 
    2420   * Allocation period: From 1 October 2019 to 30 September 2020 
    25  * Pour mémoire : Call 17  
    26    * Clos le 2 mai 2018 
     21 * Pour mémoire :  
     22   * Call 18 
     23   * Opening of the call: 4 September 2018 
     24   * Closing of the call: 30 October 2018, 10:00 Brussels time 
     25   * Allocation period: From 2 April 2019 to 1 April 2020 
    2726   * Disponible sur irene :  
    2827  || System     || Architecture || Site (Country) ||    Core Hours (node hours) || Minimum request || 
    29 || Irene (Joliot Curie) – SKL ||        Bull Sequana X1000      || GENCI@CEA (FR)       || 134 million (2.8 million) ||         15 million core hours || 
     28|| Irene (Joliot Curie) – SKL ||        Bull Sequana X1000      || GENCI@CEA (FR)       || 142 million (3 million) ||   15 million core hours || 
    3029 
    3130== Demandes d'heures A6 : date limite 7 février 2019 11h ==