Changes between Version 205 and Version 206 of PerformancesIPSLCM6


Ignore:
Timestamp:
01/10/20 18:15:14 (4 years ago)
Author:
oboucher
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • PerformancesIPSLCM6

    v205 v206  
    1111 
    1212Voir : http://www.prace-ri.eu/prace-project-access/ 
    13  
    14  * Call 19 
    15    * Opening of the call: 5 March 2019 
    16    * Closing of the call: 30 April 2019, 10:00 Brussels time 
    17    * Allocation period: From 1 October 2019 to 30 September 2020 
    18   || System     || Architecture || Site (Country) ||    Core Hours (node hours) || Minimum request || 
    19 || Irene (Joliot Curie) – SKL ||        Bull Sequana X1000      || GENCI@CEA (FR)       || 142 million (3 million) ||   15 million core hours || 
    20  
    21  * Pour mémoire :  
    22    * Call 18 
    23    * Opening of the call: 4 September 2018 
    24    * Closing of the call: 30 October 2018, 10:00 Brussels time 
    25    * Allocation period: From 2 April 2019 to 1 April 2020 
    26  
    2713== Demandes d'heures A7 : date limite 9 septembre 2019 10h == 
    2814