New URL for NEMO forge!   http://forge.nemo-ocean.eu

Since March 2022 along with NEMO 4.2 release, the code development moved to a self-hosted GitLab.
This present forge is now archived and remained online for history.
#2150 (TOP-02_emalod_OASIS_interface_between_TOP_and_NEMO) – NEMO

Opened 5 years ago

Last modified 3 years ago

#2150 assigned Task

TOP-02_emalod_OASIS_interface_between_TOP_and_NEMO — at Version 4

Reported by: emalod Owned by: emalod
Priority: high Milestone: Unscheduled
Component: TOP Version: trunk
Severity: minor Keywords:
Cc:

Description (last modified by nemo)

OASIS coupling interface between TOP and NEMO

Context

IMMERSE project: Increase modularity of NEMO components - macro-task parallelism

Proposal

We propose to shape the existing ocean/sea-ice interface to an ocean/biogeochemistry coupling, to make possible the computing of TOP/Pisces equations (Aumont et al. 2015) in a separate executable and its coupling to the rest of the NEMO model. This modularity is supposed to enhance the overall computing performances by allowing (i) to reduce the TOP/Pisces module horizontal resolution and (ii) to choose the best suited parallel decomposition for both components. Regardless to result modifications that have to be evaluated, computation of the two modules can be performed concurrently, reducing time to solution even more. The OASIS coupling library (Craig at al., 2017), basis of the existing ocean/sea-ice interface, will ensure the efficient (parallel) communication of 3D fields, the easy switch between sequential and concurrent modes and, possibly, the coupling field interpolation.

Commit History (0)

(No commits)

Change History (4)

comment:1 Changed 5 years ago by nemo

  • Type changed from Enhancement to Task

comment:2 Changed 5 years ago by nemo

  • Description modified (diff)
  • Owner changed from systeam to emalod
  • Status changed from new to assigned
  • Summary changed from OASIS coupling interface between TOP and NEMO to TOP-02_emalod_OASIS_interface_between_TOP_and_NEMO

comment:3 Changed 5 years ago by nemo

  • Priority changed from low to high

comment:4 Changed 4 years ago by emalod

  • Milestone changed from IMMERSE 2019 to IMMERSE 2020
  • wp_comment changed from Unspecified to OASIS interface codes Performance measurement ongoing Milestone to be delivered end of February 2020
Note: See TracTickets for help on using tickets.