Description (last modified by nemo)
OASIS coupling interface between TOP and NEMO
Context
IMMERSE project: Increase modularity of NEMO components - macro-task parallelism
Proposal
We propose to shape the existing ocean/sea-ice interface to an ocean/biogeochemistry coupling, to make possible the computing of TOP/Pisces equations (Aumont et al. 2015) in a separate executable and its coupling to the rest of the NEMO model. This modularity is supposed to enhance the overall computing performances by allowing (i) to reduce the TOP/Pisces module horizontal resolution and (ii) to choose the best suited parallel decomposition for both components. Regardless to result modifications that have to be evaluated, computation of the two modules can be performed concurrently, reducing time to solution even more. The OASIS coupling library (Craig at al., 2017), basis of the existing ocean/sea-ice interface, will ensure the efficient (parallel) communication of 3D fields, the easy switch between sequential and concurrent modes and, possibly, the coupling field interpolation.
Commit History (0)
(No commits)
Change History (4)
comment:1 Changed 5 years ago by nemo
- Type changed from Enhancement to Task
comment:2 Changed 5 years ago by nemo
- Description modified (diff)
- Owner changed from systeam to emalod
- Status changed from new to assigned
- Summary changed from OASIS coupling interface between TOP and NEMO to TOP-02_emalod_OASIS_interface_between_TOP_and_NEMO
comment:3 Changed 5 years ago by nemo
- Priority changed from low to high
comment:4 Changed 4 years ago by emalod
- Milestone changed from IMMERSE 2019 to IMMERSE 2020
- wp_comment changed from Unspecified to OASIS interface codes Performance measurement ongoing Milestone to be delivered end of February 2020