New URL for NEMO forge!   http://forge.nemo-ocean.eu

Since March 2022 along with NEMO 4.2 release, the code development moved to a self-hosted GitLab.
This present forge is now archived and remained online for history.
Ticket Diff – NEMO

Changes between Version 1 and Version 10 of Ticket #2199


Ignore:
Timestamp:
2019-09-09T12:09:26+02:00 (5 years ago)
Author:
jchanut
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Ticket #2199

    • Property Status changed from new to assigned
    • Property Component changed from TOP to AGRIF
    • Property Wp_comment changed from to Request for preview submitted on May 15
    • Property Summary changed from AGRIF-03_XXX_small_jpi_jpj to AGRIF-01_jchanut_small_jpi_jpj
    • Property Priority changed from low to normal
    • Property Owner set to jchanut
  • Ticket #2199 – Description

    v1 v10  
    11==== Summary 
    22 
    3 ||=Action       || ''NST and small jpi or jpj''                                 || 
    4 ||=PI(S)        || ''To be decided...''                              || 
    5 ||=Digest       || ''use mi0, mi1, mj0, mj1 in NST routines''      || 
    6 ||=Dependencies ||                                                            || 
    7 ||=Branch       || ''[source:/NEMO/branches/$YEAR/dev_r{REV}_{ACTION_NAME}]'' || 
    8 ||=Previewer(s) ||                                                            || 
    9 ||=Reviewer(s)  ||                                                            || 
    10 ||=Wiki         || ''wiki:2019WP/AGRIF-03_XXX_small_jpi_jpj''                                   || 
    11  
    12  
     3||=Action'''    || AGRIF-01_jchanut_small_jpi_jpj      || 
     4||=PI(S)'''     || Jérôme Chanut                       || 
     5{{{#!th style='text-align: left' 
     6Digest 
     7}}} 
     8{{{#!td 
     9Remove restriction on minimum domain size with AGRIF. AGRIF is indeed no more working if the mpi subdomain is so small that all boundary conditions cannot be done within the subdomain.[[BR]] 
     10This happen in fact quite easily for the sponge layer 
     11}}} 
     12|- 
     13||=Dependencies ||                                                                        || 
     14||=Expected for || 2019WP                                                                 || 
     15||=Ticket       || #2199                                                                  || 
     16||=Branch       || [source:/NEMO/branches/2019/dev_r10973_AGRIF-01_jchanut_small_jpi_jpj] || 
     17||=Previewer(s) || S. Masson                                                              || 
     18||=Reviewer(s)  || S. Masson                                                              || 
     19||=wiki         || ''wiki:2019WP/AGRIF-01_jchanut_small_jpi_jpj''                         ||  
    1320==== Abstract 
    1421 
    1522AGRIF is no more working if the mpi subdomain is so small that all boundary conditions cannot be done within the subdomain.[[BR]] 
    1623This happen in fact quite easily for the sponge layer... 
    17  
    18 ===== Description 
    19  
    20 Contrary to other parts of the code, AGRIF interface for NEMO (NST routines) is using, for example, nbondi, western_side, eastern_side to deal with the presence or for of boundary conditions...[[BR]] 
    21 We should use the mi0, mi1, mj0, mj1 arrays do do this in a cleaner way that would in addition work for any size of jpi and jpj (at least until 3) 
    22  
    23  
    24 ===== Implementation 
    25  
    26 ''Describe flow chart of the changes in the code. \\ 
    27 List the .F90 files and modules to be changed.    \\ 
    28 Detailed list of new variables (including namelists) to be defined, give for each the chosen name (following coding rules) and definition.'' 
    29  
    30  
    31 ===== Reference manual and web pages updates 
    32  
    33 ''Using part 1 and 2, define the summary of changes to be done in reference manuals (tex files), guide (rst files) and in the content of web pages.'' 
    34  
    35 Once the PI has completed this section, he should send a mail to the previewer(s) asking them to preview the work within two weeks.