New URL for NEMO forge!   http://forge.nemo-ocean.eu

Since March 2022 along with NEMO 4.2 release, the code development moved to a self-hosted GitLab.
This present forge is now archived and remained online for history.
2014WP/2014Action_institutions_INGV (diff) – NEMO

Changes between Version 4 and Version 5 of 2014WP/2014Action_institutions_INGV


Ignore:
Timestamp:
2014-12-01T17:06:46+01:00 (9 years ago)
Author:
emanuelaclementi
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • 2014WP/2014Action_institutions_INGV

    v4 v5  
    1616 
    1717|| Action || Brief description || Status || Branch name || Trac ticket n° || Wiki page name || Reviewer(s) || Review status || Nb of weeks || Ready for merge. If "NO", reason and status for 2014 || 
    18 || INGV-1 || Continuation of Surface Pressure effect developments in limited area model || started in 2012 || dev_r3389_INGV1+atmpres || 968 || wiki:ticket/968 || || || || || 
    19 || INGV-2 || NEMO model reliability || || || || || || || || || 
    20 || INGV-3 || River lateral open boundary conditions || || || || || || || || || 
    21 || INGV-4 || Wave-current interaction || || || || || || || || || 
    22 || INGV-5 || Participate to the Confioguration Manager WG || || || || || || || || || 
    23 || INGV-6 || GMD NEMO Special Issue || || || || || || || || || 
     18|| INGV-1 || Continuation of Surface Pressure effect developments in limited area model || started in 2012 || dev_r3389_INGV1+atmpres || 968 || wiki:ticket/968 || || || || done although becoming partly useless with choices on simplification. A paper has been accepted for the NEMO special issue|| 
     19|| INGV-2 || NEMO model reliability || || || || || || || || done continuously || 
     20|| INGV-3 || River lateral open boundary conditions || || || || || || || || postponed|| 
     21|| INGV-4 || Wave-current interaction || || || || || || || || in 2014 the WAVE WG met and identified, as a first step development, a set of large scale wave effects to be implemented. Some technical issues have been identified with respect to a development branch created implementing the work done by ECMWF. In 2015 the identified issues will be implemented by the WAVE WG and a proper configuration will be created to test the developments. Time will be dedicated to start discussing the second phase development identifying the coastal processes to be implemented|| 
     22|| INGV-5 || Participate to the Confioguration Manager WG || || || || || || || || Participation to the WG|| 
     23|| INGV-6 || GMD NEMO Special Issue || || || || || || || || NEMO Special Issue successfully created, but the number of paper submitted by System Team is much mower than announced. Question should be addressed by the end of this year on the future of this initiative: having a nearly empty GMD Special Issue may not be the best way to emphasize the development efforts    || 
    2424 
    2525----