Version 4 (modified by acc, 10 years ago) (diff) |
---|
NOC-NEMO team - 2014 actions
Last edited Timestamp?
WARNING page currently in progress
members
Name | Institution | % | Position |
Andrew Coward | NOCS | 60 | NEMO Officer |
George Nurser | NOCS | 10 | |
James Harle | NOCL | 30 |
Summary: List here actions of the institution so as contributions to shared actions
Action | Brief description | Status | Branch name | Trac ticket n° | Wiki page name | Reviewer(s) | Review status | Nb of weeks | Ready for merge If "NO", reason and status for 2015 |
NOC-1 | Refinement of Griffies operator | ||||||||
NOC-2 | Testing, validation and commissioning of recent major changes | ||||||||
NOC-3 | System simplification | ||||||||
NOC-4 | On-line vertical interpolation of BDY data and related configuration manager options |
NOC-1 - Refinement of Griffies operator
Motivation: Improvements to the computation of properties along isopycnal slopes and a full investiagtion into opportunities for optimising performance
Status : xx
Main tasks : Add algorithmic improvements. Profile performance on at least two architectures. Investigate bottlenecks and look for generic improvements in performance that can be made without compromising code readability.
Science Reviewer: George Nurser
System Reviewer: Gurvan Madec
Deadline: Aug 2014
Priority:
Depends on:
Principal Investigator : Andrew Coward
NOC-2 - Testing, validation and commissioning of recent major changes
Motivation: NOCS is responsible for several recent additions which need more thorough testing to establish them as acceptable default options. These are: a. The Griffies operator; b. Z-tilde verical coordinate and c. Ice embedding. A major component of the NOC 2014 work-plan will be to test these options both individually and in concert in demanding global configurations.
Status : xx
Main tasks : Set up test cases with ORCA1, ORCA025 and ORCA0083. Perform multi-centennial tests with ORCA1; multi-decadal tests with ORCA025 and high-variability tests (e.g. tides) with ORCA0083. Document recommeneded settings and results.
Science Reviewer: Gurvan Madec
System Reviewer:
Deadline: Sept 2014
Priority:
Depends on: NOC-1
Principal Investigator : Andrew Coward
NOC-3 - System simplification
Motivation: As a first step towards system simplification unused options will be removed and the non-linear free surface will become the default.
Status : xx
Main tasks : Remove the unrecommended Neptune options. Add thickness weighted tendency calculations as default. Make the non-linear free surface the default.
Science Reviewer:
System Reviewer:
Deadline:
Priority:
Depends on:
Principal Investigator : Andrew Coward
NOC-4 - On-line vertical interpolation of BDY data and related configuration manager options
Motivation: An online vertical interpolation for BDY inputs is needed to allow easy switching between vertical coordinate systems without the need to alter input boundary files.
Status : xx
Main tasks : Implement an on-line vertical interpolation of BDY inputs. Test thoroughly in, at least, the AMM configuration. Ensure the vertical interpolation schemes are generic and modular enough to also be used in the configuration manager tools and add this functionality to these tools. Document and record test cases.
Science Reviewer:
System Reviewer: Dave Storkey/Jerome? Chanut
Deadline:
Priority:
Depends on:
Principal Investigator : James Harle