= 3_6_STABLE final sprint = == Sequence of actions for each branch == For each development branch to be committed in the trunk, following steps have been fullfilled: * Branch has been validated regarding its new features in appropriate way, and if possible tested on a CMIP6 like configuration or at least on the ORCA2_LIM3 reference configuration (using vvl) * SETTE tests passed:''' run sette.sh and sette_xios.sh''' * Reviewer has approved Since the timing is tight and we need to check each step, changes in the trunk will be made sequentially, and tested at each step. For a given branch to be commited, sequnce should be: * Update the branch to head of trunk * Final test of the branch * merge branch with trunk: this should include documentation in reference manual.... * SETTE test on new trunk * Commit new trunk * Send a mail to nemo_st to say you've finished (in order for the next branch to be able to start, see proposed agenda below) == == == Ongoing work == || Date || Description || PI || trunk rev. before commit || SETTE before || trunk rev. after commit || SETTE after || comments || || || ocean-ice through OASIS and coupled interfaces || S. Masson || || || || || || || || HPC LIM3 optimisations || M. Castrillo || || || || || || |||| Bugfixes: please add yours below || || || || || || || || 10/06/2015 || ahmcoef now read in netcdf file instead of ascii file || R. Bourdalle || 5395 || ok || 5395 ||ok || ticket 1531|| || 10/06/2015 ||use IOF for geothermal file reading || R. Bourdalle || 5396 || ok || 5398 ||ok || ticket 1535|| || 10/06/2015 || change fldread to allow reading of 4 dimensions files || R. Bourdalle || 5398 || ok || 5399 ||ok || ticket 1536|| || 12 june || Decide revision number for tests ||5398 || || || || || || || 12-20 june || Intensive tests (add yours below) || || || || || || || || 20 june || Create and announce 3_6_STABLE || || || || || || || || || || || || || || || || == 12-20 June: list of tests == Each System Team member is expected to contribute, tests to be done on the trunk after final bugifxes and before creation of 3_6_STABLE (revision to be confirmed here) on 12 June. All results to be summarized here: http://www.nemo-ocean.eu/Developing-with-NEMO/Validation/nemo-v3.6_STABLE-Validation === SETTE : add one PI per institution === === All specific tests (add your below): ===