New URL for NEMO forge!   http://forge.nemo-ocean.eu

Since March 2022 along with NEMO 4.2 release, the code development moved to a self-hosted GitLab.
This present forge is now archived and remained online for history.
2015WP/ZZ_VideoconfOnWPProposal_20nov2014 (diff) – NEMO

Changes between Version 12 and Version 13 of 2015WP/ZZ_VideoconfOnWPProposal_20nov2014


Ignore:
Timestamp:
2014-11-21T11:47:56+01:00 (9 years ago)
Author:
clevy
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • 2015WP/ZZ_VideoconfOnWPProposal_20nov2014

    v12 v13  
    6666 
    6767== Discussion == 
    68  * What about the developments, updates... in the coupling interface, needed for CMIP6? They are not listed in 2015 workplan[Uwe Fladrich,  EC-EARTH] 
     68 * What about the developments, updates... in the coupling interface, needed for CMIP6? They are not listed in 2015 workplan[Uwe Fladrich,  EC-EARTH] 
    6969 
    7070Those are expected to be finalised now (i.e. for the Merge Party in december 2014), or at the latest very beginning of 2015. Planning is to have the nemo_v3.6_STABLE release ready and fully validated for CMIP6 mid-2015. 
     
    7272 * Could we have some details on HPC actions in 2015? What about HPC-2 action (MERCATOR - M. Chekki)? Are there some plans to look in details at relative performance of routines in NEMO?[Kim Serradell Maronda, BSC] 
    7373 
    74 M. Chekki will be PI of an action on HPC still to be defined. [[BR]]BSC is more then welcome to contribute ''(to be discussed between BSC and S. Masson, leader of HPC working group)'' 
     74 A. Chekki will be PI of an action on HPC still to be defined. [[BR]]BSC is more then welcome to contribute ''(to be discussed between BSC and S. Masson, leader of HPC working group)'' 
    7575 
    7676 * What about OpenMP? [J. Holt] 
     
    7979 
    8080 * How and when is the validation for CMIP6 going to take place? [Uwe Fladrich, EC-EARTH] 
     81 
     82There are 2 target configurations (with a fewdecinations for each): ORCA1 and ORCA025. A first set of validation will take place during the first semester of 2015.[[BR]]For ORCA1, 2 focal points/actions are identified:[[BR]]- ORCA1_LIM3_PISCES: Action "ROBUST-2" - NEMO ready for ESMs-CMIP6: ORCA1_LIM3_PISCES (C. Lévy); and some work on ORCA1_CICE at NOC (A. Coward).[[BR]]- ORCA025: Actions "ROBUST-3" Met-Office and "ROBUST-4"at Mercator.[[BR]]Comment by J. Le Sommer: there are 2 levels of testing: a "functionnal" level, and some work need to asses solutions. For the second one, a dedicated session will take place dunring the next DRAKKAR meeting, and an ocean medel development group meeting (CLIVAR) will take place afterwards also in Grenoble (in order to define a common forcing strategy). [[BR]]Comment by Uwe Fladrich: EC_EARTH will continue to assess results and send feedback through tickets 
     83 
    8184 * What about the list of reference configuration? Could there be a coupled configuration (i.e. ESM-like) in the list? [Uwe Fladrich, EC-EARTH] 
    8285 * What about the diagnostics when using variable volume layers [O. Marti]