NERC-noC 2017
Last edition: Wikinfo(changed_ts)? by Wikinfo(changed_by)?
Additional NEMO ST members involved
Name | Institution | % | Position
|
George Nurser | noC | 10% | System team
|
James Harle | noC | 10% | System team
|
Gurvan Madec | noC/CNRS | 5% | NEMO Lead
|
Action | NOC-1_Nurser-OSMOSIS
| PI(S) | George Nurser
|
Digest
|
Implement mixed layer parameterisation arising from the OSMOSIS project.
This is a new parameterisation (publication under review), derived from first principles that takes full account of the mixing induced by Langmuir circulations
|
Dependencies | Depends on ...
| Target | Priority or deadline
| Trac Ticket | #XXXX
| SVN branch | branches/2017/dev_CNRS_2017
| Previewer(s) | Gurvan
| Reviewer(s) | Gurvan
| Status | Successful by Dec 2017
| Link | ExtractUrl(.)?
|
|
|
Action | ROBUST-8_AndrewC-MPP_no_ghost
| PI(S) | Andrew Coward
|
Digest
|
With the move to full dynamic allocation there is no need to retain a uniform jpi and jpj across all processing regions.
Allowing these to vary will permit simplification by removing the possibility of 'ghost' rows or columns and therefore remove the need for the confusing number of start and end markers such as nldi and nlci.
This work should also simplify the introduction of wider haloes.
|
Dependencies | Depends on ...
| Target | Priority or deadline
| Trac Ticket | #1915
| SVN branch | branches/2017/dev_r8126_ROBUST08_no_ghost
| Previewer(s) | Gurvan
| Reviewer(s) | Gurvan
| Status | Successful by Dec 2017
| Link | ExtractUrl(.)?
|
|
Action | NOC-2_JamesH-SCO_ISF
| PI(S) | James Harle
|
Digest
|
The simulation of dense water cascading from the shelf has been shown to benefit from the use of S-coordinate and mixed S-coordinate/partial step vertical grids in Arctic simulations.
To gain maximum benefit in Antarctic simulations will require the under Ice-ShelF component to be adapted to work with the alternative vertical coordinates.
This work will address this issue and will fully test solutions in a 'PERIANT' type model of the Southern Ocean being developed under the UK 'ORCHESTRA' project.
|
Dependencies | Depends on ...
| Target | Priority or deadline
| Trac Ticket | #1955
| SVN branch | branches/$YEAR/dev_r{REV}_{WGorINSTITUTE}-{NUM}_{PIS}-{KEYWORDS}
| Previewer(s) | Names
| Reviewer(s) | Names
| Status | Postponed due to other commitments
| Link | ExtractUrl(.)?
|
|