Name and subject of the action

Last edition: 01/21/20 11:43:46 by andmirek

The PI is responsible to closely follow the progress of the action, and especially to contact NEMO project manager if the delay on preview (or review) are longer than the 2 weeks expected.

  1. Summary
  2. Preview
  3. Tests
  4. Review

Summary

This development is part of IMMERSE project.

a) Extend use of XIOS to read/write restart for SI3 and TOP

b) Use XIOS to read configuration data

Robustness of the functionality:

  • Update one of the SETTE tests to use this read/write restart via XIOS to keep this functionality tested

Preview

Since the preview step must be completed before the PI starts the coding, the previewer(s) answers are expected to be completed within the two weeks after the PI has sent the request to the previewer(s).
Then an iterative process should take place between PI and previewer(s) in order to find a consensus

Possible bottlenecks:

  • the methodology
  • the flowchart and list of routines to be changed
  • the new list of variables wrt coding rules
  • the summary of updates in literature

Once an agreement has been reached, preview is ended and the PI can start the development into his branch.

Tests

Once the development is done, the PI should complete the tests section below and after ask the reviewers to start their review.

This part should contain the detailed results of SETTE tests (restartability and reproducibility for each of the reference configuration) and detailed results of restartability and reproducibility when the option is activated on specified configurations used for this test

Regular checks:

  • Can this change be shown to produce expected impact (option activated)?
  • Can this change be shown to have a null impact (option not activated)?
  • Results of the required bit comparability tests been run: are there no differences when activating the development?
  • If some differences appear, is reason for the change valid/understood?
  • If some differences appear, is the impact as expected on model configurations?
  • Is this change expected to preserve all diagnostics?
  • If no, is reason for the change valid/understood?
  • Are there significant changes in run time/memory?

Review

review of the part related to the restarts with XIOS done here: https://forge.ipsl.jussieu.fr/nemo/ticket/2323#comment:14