MERCATOR-NEMO team - 2011 actions
-
MERCATOR-NEMO team - 2011 actions
-
- MERCATOR.1 — Improvement of OBCs: end of 2011 task
- MERCATOR.2 — PPM advection scheme
- MERCATOR.3 — resolving the 2 versions of time-stepping
- MERCATOR.4 — implementation of OBC's schemes for PISCES
- MERCATOR.5 — Solar flux filtering at daily frequency to force …
- MERCATOR.6 — Degradation toolbox.
- MERCATOR.7 — Data assimilation interface: model equivalent of a SST …
- MERCATOR.8 — Data assimilation interface: model equivalent of a SLA …
- MERCATOR.9 — Discussion on implementing a configuration manager
- MERCATOR.10 — User Support
- MERCATOR.11 — Code Reviewing
- MERCATOR.12 — Beta Testing
- MERCATOR.13 — Exchange with others centers
-
Last edited Timestamp?
members
Name | Institution | % | Position |
Clément Bricaud | Mercator Océan, Toulouse | 25% | Mercator NEMO officer |
Yann Drillet | Mercator Océan, Toulouse | 5% | Mercator Consortium expert |
Guillaume Reffray | Mercator Océan, Toulouse | 10% | Mercator developper |
Jerome Chanut | Mercator Océan, Toulouse | 10% | Mercator developper |
Elisabeth Remy | Mercator Océan, Toulouse | 10% | Mercator developper |
Coralie Perruche | Mercator Océan, Toulouse | 10% | Mercator developper |
Julien Paul | Mercator Océan, Toulouse | 10% | Mercator developper |
Gilles Garric | Mercator Océan, Toulouse | 5% | Mercator developper |
Olivier Legalloudec | Mercator Océan, Toulouse | 5% | Mercator developper |
Romain Bourdalle-Badie | Mercator Océan, Toulouse | 5% | Mercator developper |
Mondher Chekki | Mercator Océan, Toulouse | 5% | Mercator developper |
total weeks :
40 wk (1 man/year)
Summary:
Action | nb weeks | Brief description | Status | Branch name | Trac ticket n° | Wiki page name | Reviewer(s) | Review status | Ready for merge |
Mercator-1 | 4 | Improvment of OBC's | will be ok for merge 2012 | dev_r3327_MERCATOR1_BDY | 937 | https://forge.ipsl.jussieu.fr/nemo/wiki/ticket/937 | D. Storkey | ||
Mercator-2 | 2 | PPM horizontal advection scheme | waiting for vertical part from NOCL; postponned | ||||||
Mercator-3 | 4 | resolving the 2 versions of time-stepping | part1 ok ; postponned | ||||||
Mercator-4 | 2 | implementation of OBC's schemes for PISCES | postponned | ||||||
Mercator-5 | 2 | Solar flux filtering at daily frequency to force biogeochemistry model | devlopment ok; postponned | ||||||
Mercator-6 | 2 | Degradation toolbox | canceled | ||||||
Mercator-7 | 2 | Data assimilation interface: model equivalent of a SST night | will be ok for merge 2012 | dev_r3342_MERCATOR7_SST | 944 | https://forge.ipsl.jussieu.fr/nemo/wiki/ticket/944 | D. Lea | ||
Mercator-8 | 2 | Data assimilation interface: model equivalent of a SLA | postponned | ||||||
Mercator-9 | 2 | Discussion on implementing a configuration manager | done | ||||||
Mercator-10 | 2 | User Support | |||||||
Mercator-11 | 2 | Code Reviewing | |||||||
Mercator-12 | 4 | Beta Testing | |||||||
Mercator-13 | 4 | Exchange with others centers |
MERCATOR.1 — Improvement of OBCs: end of 2011 task
Motivation: participate to merge of OBC and BDY; work on atmospheric pressure and tide forcing in the new package
Status : --
main tasks : --
Principal Investigator : Jerome Chanut (jchanut@…)
Deadline : --
Priority: High
Science Reviewer : --
System Reviewer : --
Number of weeks : 4 (TBC)
MERCATOR.2 — PPM advection scheme
Motivation: Add another scheme for tracers advection: horizontal part. Vertical part will be made by NOCL.
Status : Running on NEMO_3.2.
main tasks :review.
Principal Investigator : Guillaume Reffray (greffray@…)
Deadline :
Priority: Low
Science Reviewer :
System Reviewer :
Number of weeks : 2
MERCATOR.3 — resolving the 2 versions of time-stepping
Motivation: Tracer conservation and time splitting. reference: Shchepetkin, A. F., and J. C. McWilliams?, 2005
Status :Running in NEATL36 at Mercator.
main tasks : Main idea:replace Leapfrog scheme by a Fb tamporal scheme, but keep actual method for updating ssh at 3D time-stepping.
workplan:
1.test some eventual problem of divergence of SSh in barotropic mode compared to SSH in 3d mode ( cf Hallberg and Adcroft, OM 2009: Reconciling estimates of the free surface height in Lagrangian vertical coordinate ocean models with mode-split time stepping).
2.implementation in NEMO_3.3 of this time-splitting.
3.test in high-resolution configuration at Mercator.
4.take a decision for reorganization of step for time-splitting.
Priority: High
Principal Investigator : Clement Bricaud & Jerome Chanut (jchanut@…)
Number of weeks : 4 (TBC)
MERCATOR.4 — implementation of OBC's schemes for PISCES
Motivation: Use new package ; implement new methods.
Status :
main tasks :
Principal Investigator : Guillaume Reffray (greffray@…)
Priority:
Science Reviewer : --
System Reviewer :
Number of weeks : 2 (TBC)
MERCATOR.5 — Solar flux filtering at daily frequency to force biogeochemistry model.
Motivation: For coupled model ( physic + bio ): physic needs 24 hours (+ diurnal cycle) or 3 hours solar fluxes, but bio need a 24 hours mean.
Status :
main tasks :
Principal Investigator : Coralie Perruche(cperruche@…)
Priority:
Science Reviewer : --
System Reviewer :
Number of weeks : 2 (TBC)
MERCATOR.6 — Degradation toolbox.
Motivation: Usefull for offline forcing of tracers. adaptation for patial steps.
Status :
main tasks :
Principal Investigator : Coralie Perruche(cperruche@…)
Priority:
Science Reviewer : --
System Reviewer :
Number of weeks : 2 (TBC)
MERCATOR.7 — Data assimilation interface: model equivalent of a SST night
Motivation:
Status :
main tasks :
Principal Investigator : Elisabeth Remy (eremy@…)
Priority:
Science Reviewer : --
System Reviewer :
Number of weeks : 2 (TBC)
MERCATOR.8 — Data assimilation interface: model equivalent of a SLA
Motivation:
Status :
main tasks :
Principal Investigator : Elisabeth Remy (eremy@…)
Priority:
Science Reviewer : --
System Reviewer :
Number of weeks : 2 (TBC)
MERCATOR.9 — Discussion on implementing a configuration manager
Motivation: Add a configuration manager
Status :
main tasks : discussions, working group, make specifications.
Principal Investigator :Julien Paul (jpaul@…)
Priority:
Science Reviewer : --
System Reviewer :
Number of weeks : 2 (TBC)
MERCATOR.10 — User Support
Motivation:Provide support to users of NEMO.
Number of weeks : 2
MERCATOR.11 — Code Reviewing
Motivation:Reviewing code from NEMO partners
Number of weeks : 4
MERCATOR.12 — Beta Testing
Motivation:Beta testing of the next relaese
Number of weeks : 4
MERCATOR.13 — Exchange with others centers
Motivation:System Team meetings, Developers Team meetings,NEMO Users meetings, partcipate to the merge party.
Number of weeks : 4
aditionnal work:
adaptation of PISCES to the VVL : compare work done by Guillaume Reffray with work done by UK Met Office.