Version 32 (modified by cbricaud, 11 years ago) (diff) |
---|
Mercator-NEMO team - 2013 actions
-
Mercator-NEMO team - 2013 actions
-
- '''MERCATOR.1 — resolving the 2 versions of time-stepping'''
- MERCATOR.2 — exploration of implicit bottom friction
- '''MERCATOR.3 — Solar flux filtering at daily frequency to force …
- '''MERCATOR.4 — Implementation of a configuration manager '''
- '''MERCATOR.5 — Add a 1D reference configuration on PAPA station '''
- '''MERCATOR.6 — End of OBC-BDY merge, with UK Metoffice '''
- '''MERCATOR.7 — implementation of OBC's schemes for PISCES '''
- '''MERCATOR.8 — Data assimilation interface: model equivalent of a SLA …
-
Last edited Timestamp?
members
Name | Institution | % | Position |
Clément Bricaud | Mercator Océan, Toulouse | 20% | Mercator NEMO officer |
Guillaume Reffray | Mercator Océan, Toulouse | 20% | Mercator developper |
Jerome Chanut | Mercator Océan, Toulouse | 20% | Mercator developper |
Julien Paul | Mercator Océan, Toulouse | 20% | Mercator developper |
Romain Bourdalle-Badie | Mercator Océan, Toulouse | 20% | Mercator developper |
Mondher Chekki | Mercator Océan, Toulouse | 0% | Mercator Consortium expert |
Yann Drillet | Mercator Océan, Toulouse | 0% | Mercator Consortium expert |
total weeks :
40 wk (1 man/year)
Summary:
Action | nb weeks | Brief description | Status | Branch name | Trac ticket n° | Wiki page name | Reviewer(s) | Review status | Ready for merge. If "NO", reason and status for 2014 |
Mercator-1 | 6 | resolving the 2 versions of time-stepping | will be OK for merge 2013 | dev_r3867_MERCATOR1_DYN | 1079 | YES | |||
Mercator-2 | 2 | exploration of implicit bottom friction | included in Mercator-1 | 1079 | YES | ||||
Mercator-3 | 2 | Solar flux filtering at daily frequency to force biogeochemistry model | will be OK for merge 2013 | dev_r3856_MERCATOR3_QSRMEAN24H | 1076 | YES | |||
Mercator-4 | 3 | Implementation a configuration manager | a first version will be provided for merge 2013 | to be finished in 2014 ; need more time to add new functionnalities and remove some bugs | |||||
Mercator-5 | 3 | Add a 1D reference configuration on PAPA station | will be OK for merge 2013 | dev_r4022_MERCATOR5_PAPA1D | 1152 | YES | |||
Mercator-6 | 6 | End of BDY-OBC merge | Will be OK for merge 2013 | dev_r3987_METO1_MERCATOR6_OBC_BDY_merge | 1090 | YES | |||
Mercator-7 | 2 | implementation of OBC's schemes for PISCES | postponned 2014 | waiting for CMCC.6 Surface and lateral boundary conditions for tracers | |||||
Mercator-8 | 3 | Data assimilation interface: model equivalent of a SLA | postponned 2014 | not started ; need some time to find a solution to filter HF in ssh ( done on 21 days in AVISO ) |
Major points of Mercator's contribution:
'''MERCATOR.1 — resolving the 2 versions of time-stepping'''
Motivation: Tracer conservation and time splitting. reference: Shchepetkin, A. F., and J. C. McWilliams? , 2005
Status : Running in NEATL36 at Mercator.
main tasks : Main idea:replace Leapfrog scheme by a Fb tamporal scheme, but keep actual method for updating ssh at 3D time-stepping.
workplan:
1. test some eventual problem of divergence of SSh in barotropic mode compared to SSH in 3d mode ( cf Hallberg and Adcroft, OM 2009: Reconciling estimates of the free surface height in Lagrangian vertical coordinate ocean models with mode-split time stepping).
2. implementation in NEMO_3.3 of this time-splitting.
3. test in high-resolution configuration at Mercator.
4. take a decision for reorganization of step for time-splitting.
Priority: High
Principal Investigator : Clement Bricaud & Jerome Chanut (jchanut@…)
Science Reviewer : Gurvan Madec --
System Reviewer : Gurvan Madec
Number of weeks : 4 (TBC)
MERCATOR.2 — exploration of implicit bottom friction
Motivation: Use NEMO standard implicit bottom friction in Mercator Regional configuration ( z-coord ).
Status :
main tasks :
Principal Investigator : Jerome Chanut (jchanut@…)
Priority: high
Science Reviewer :
System Reviewer :
Number of weeks : 2 (TBC)
'''MERCATOR.3 — Solar flux filtering at daily frequency to force biogeochemistry model. '''
Motivation: For coupled model ( physic + bio ): physic needs 24 hours (+ diurnal cycle) or 3 hours solar fluxes, but bio need a 24 hours mean.
Status : End of 2012 task
main tasks :
Principal Investigator : Clement Bricaud (cbricaud@…)
Priority: high
Science Reviewer : Gurvan Madec --
System Reviewer : Gurvan Madec
Number of weeks : 2 (TBC)
'''MERCATOR.4 — Implementation of a configuration manager '''
Motivation: Add a configuration manager
Status :
main tasks :
a first version is implemented:
built a coordinate file from ORCA 1/4 to higher resolution: OK
built a bahtymetry from a ORCA025 bathymetriy on higher resolution and extract it on the domain: OK
Merge mother and child bahtymetry: to be debugued.
Create boundaries files: to be debugued.
Create Initial conditions from restat/model output/climatology files: OK
Principal Investigator : Julien Paul (jpaul@…)
Priority: high
Science Reviewer : --
System Reviewer :
Number of weeks : 2 (TBC)
'''MERCATOR.5 — Add a 1D reference configuration on PAPA station '''
Motivation: Vertical physics and numerics studying
Status :
main tasks :
Principal Investigator : Romain Bourdalle-Badie, Guillaume Reffray (greffray@…, rbourdal@…)
Priority: high
Science Reviewer : Marcello Vichi --
System Reviewer : Marcello Vichi
Number of weeks : 2 (TBC)
'''MERCATOR.6 — End of OBC-BDY merge, with UK Metoffice '''
Motivation: .
Status :
main tasks :
Principal Investigator : Jerome Chanut (jchanut@…)& Guillaume Reffray (greffray@…)
Priority: high
Number of weeks : 2 (TBC)
'''MERCATOR.7 — implementation of OBC's schemes for PISCES '''
Motivation: Use new package ; implement new methods.
Status :
main tasks :
Principal Investigator : Guillaume Reffray (greffray@…)
Priority:
Science Reviewer : --
System Reviewer :
Number of weeks : 2 (TBC)
'''MERCATOR.8 — Data assimilation interface: model equivalent of a SLA '''
Motivation:
Status :
main tasks : make the same treatment as done in AVISO
Principal Investigator : Elisabeth Remy (eremy@…)
Priority:
Science Reviewer : --
System Reviewer :
Number of weeks : 2 (TBC)
aditionnal work:
Agrif has been tested by Jerome: running with filtred SSH, with new time-splitting, with several levels of AGRIF zooms.
XIOS tested on high resolution global configuration ( ORCA12, ORCA025)
Major points:
Generalized forward-backward time-splitting implemented
A first release of configuration manager is implemented
A 1D-PAPA station configuration is available, for vertical physic study.