Changes between Version 30 and Version 31 of 2016WP/2016SharedActions/Workshop_NEMO_in_CMIP6
- Timestamp:
- 2015-12-09T11:02:39+01:00 (9 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
2016WP/2016SharedActions/Workshop_NEMO_in_CMIP6
v30 v31 72 72 === Detailed list of experiments in discussion === 73 73 || Institution/Name of PI || Components in play (ORCA1 or ORCA025,[[BR]]NEMO-OPA, NEMO-LIM or GELATO or CICE, NEMO-TOP or ...[[BR]]Forced (which forcing), or coupled (which atmosphere) || Specific options if different from shaconemo || Duration of experiment (years) || Comments || 74 || IPSL ||ORCA1 LIM3 PISCES Coupled with LMDZ || Model still to be tuned. Ocean options kept as close as possible from Shaconemo || || IPSL base version for CMIP6||75 || Met Office/NERC || eORCA025 CICE Coupled to UM 76 || Met Office/NERC || eORCA1 CICE MEDUSA Coupled to UM || Ocean/ice configuration intended to be traceable to ORCA025 GO6. Some tuning possible 74 || IPSL ||ORCA1 LIM3 PISCES Coupled with LMDZ || Model still to be tuned. Ocean options kept as close as possible from Shaconemo || || IPSL base version for CMIP6 || 75 || Met Office/NERC || eORCA025 CICE Coupled to UM || Ocean/ice configuration defined as GO6+GSI8. Limited tuning. || || Ocean/ice component of HadGEM3 GC3 - physical model for UKESM. Met Office/UK contribution to CMIP6 || 76 || Met Office/NERC || eORCA1 CICE MEDUSA Coupled to UM || Ocean/ice configuration intended to be traceable to ORCA025 GO6. Some tuning possible || || Basis for UKESM mid 2016-end 2017. UK contribution to CMIP6 (including OMIP). Ice shelf parameterisation/ice cavities open? || 77 77 || Met Office/NERC || eORCA025 CICE MEDUSA coupled to UM || Expected to be GO6 as above. Use DEGRAD for BGC || || UKESM 2018 onwards. Physical model GC3. UK contribution to CMIP6 (including OMIP). Ice cavities open? || 78 78 || GEOMAR || ORCA025 LIM2 || Spatial GM || OMIP period || Contribution to OMIP || 79 79 || CNRM/CERFACS || eORCA025/ORCA025 LIM3 forced run with CORE-II (IAF) and DFS5 || || CORE: 1948-2007; DFS5: 1958-2012 || NEMO_v3_6_STABLE|| 80 || IPSL-LOCEAN / Deshayes-Aumont || eORCA1 LIM3 PISCES || forced by CORE2, climato and interannual || 60 yr - 500 yr (climato) || still under evaluation / tuning || 81 || IPSL-LGGE / Deshayes-!LeSommer || eORCA025 LIM3 || forced by DFS, CORE2 interannual || few years only || still under development || 80 82 || || || || || || 81 83 || || || || || || 82 84 || || || || || || 83 85 || || || || || || 84 || || || || || ||85 || || || || || ||