Changes between Version 1 and Version 2 of 2020WP/TOP-06_emalod_OASIS_interface_between_TOP_and_NEMO
- Timestamp:
- 2020-06-08T15:05:03+02:00 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
2020WP/TOP-06_emalod_OASIS_interface_between_TOP_and_NEMO
v1 v2 63 63 }}} 64 64 65 ''...''66 65 66 * Test case name: CPL_ORCA2_PISCES 67 * Test case functionality: The test must ensure that ocean and BGC can be compiled seperately, linked with OASIS and can run concurrently 68 * Test case setup : Based on ORCA2 grid, need OASIS 69 * Test case verification value: Correct SST after a one month long simulation 70 * Status of the test case as for now : not defined yet. Status of the official ocean-BGC interface must be clarified first 67 71 == Review 68 72