Version 24 (modified by nicolasmartin, 5 years ago) (diff) |
---|
2020 Workplan
The NEMO development is planned on a yearly basis relying on the [zenodo:1472458 NEMO Development Strategy document], which designs the long term evolution (5 to 10 years) in both scientific and engineering aspects.
Shared actions
The 2020 workplan is made up of shared actions which are the development priorities for all consortium's institutions.
Follow-up
|
|
Add a proposed action in the work plan
At this stage (autumn 2019), we are building the list of possible actions for 2020. The 2020 work plan will be finalised by end of the year, with advice from the Developers Committee and decisions from the Steering committee.
The 2020 workplan must be realistic. Each action must define the 2020 objective only. If the action is expected to take more than one year, it should be explained in the Description section of the associated wiki page (see below).
To add an action in 2020 work plan proposal, you need to create the wiki page (for all actions) and the associated ticket (for 2020 IMMERSE actions only, since those are for sure already).
Once the 2020 workplan will be finalised (after Steering Committee meeting) each action will need its wiki page (action description) and its ticket (following the state of the work).
Adding a proposed action is simple: create a wiki page (eventually a ticket) following the naming conventions, and complete the wiki page information. The following description of each step will look very obvious to experienced developers, and hopefully useful for new comers.
Important: naming convention for actions and their associated wiki page and ticket
The name of an action must follow the convention: "STREAM"_"NUMBER"_"login of PI"_"keyword" , to be used both to name its wiki page and its ticket.
Following this convention, the name of the wiki page must be: forge.ipsl.jussieu.fr/nemo/wiki/2020WP/"STREAM"_"NUMBER"_"login of PI"_"keyword"
where
- "STREAM" = one of the headers of the first table (AGRIF, ASINTER, HPC, KERNEL, PHYPRO, SI3, TOP, DATINT, ENHANCE,VALID, PUBS)
- "NUMBER" = Choose a number (increment +1 to the last action already listed in your stream)
- "login of PI" : login of the PI on Trac
- "keyword" = choose a keyword for this action
1/ Create the wiki page
- After logging in with your trac login on the 2020 Work plan page https://forge.ipsl.jussieu.fr/nemo/wiki/2020WP, add at the end of page name the action name you want to create, following the naming convention above: forge.ipsl.jussieu.fr/nemo/wiki/2020WP/"STREAM"_"NUMBER"_"login of PI"_"keyword
- The NEMO wiki will answer : the page xxxx does not exist , you can create it here.
- Choose the template 'Workplan/Action' (mandatory) and create the wiki page. This will open the new page in edit mode, allowing you to move to step 2:
2/ Complete the mandatory fields in the wiki page
- In the Summary section following fields (= those in bold) must be completed:
- Action = Name and subject of the action
- PI(S) Names
- Digest = one sentence stating motivations and main tasks
- Dependencies = taksks needing to be completed before this action can start, if any
- Branch = name of development branch following naming convention (source:/NEMO/branches/{YEAR}/dev_r{REV}_{ACTION_NAME}, to add once preview is completed, e.g. not at this stage
- Previewer(s)Names
- Reviewer(s) Names
- Ticket = number of associated ticket (, to be added once ticket is created, e.g. only for IMMERSE actions for now)
- Description section (mandatory):
Please complete this section in plain English, readable by all. Description should include:
- goal of development and the methodology
- reference documents or publications if relevant
- precise statement of the objective by end 2020
- If the action is expected to continue after 2020, some elements on the context
- a statement on the priority : the action will be qualified as feasible if it is listed with associated commitment of the PI, or desirable meaning if is is hoped to be completed
The other sections of wiki page (implementation, documentation update, preview, tests etc... are expected to be completed as the action work is going on.
Once you've saved the edits of your wiki page, reload the 2020WP page to check that your action (its wiki page) now appears in the first table of the page, under the appropriate stream.
3/ For IMMERSE 2020 actions only (for now): create also the ticket for the action
- Click hereafter to create the ticket:
ticket for workplan action . Do not change the ticket type, set to "TASK", since it defines the content of the template.
- The following fields are mandatory :
- Summary = name of the ticket, same as the action name of wiki page = "STREAM"_"NUMBER"_"login of PI"_"keyword"
- Description: complete the proposed link to the wiki page since you've already wrote it there
- Select milestone (2020 workplan or 2020 IMMERSE)
- Select owner = PI of the action
- Select priority (high= feasible, normal= desirable)
- Select component
- Save the ticket and check it appears in the 2020 work plan page (second table).
- Add the ticket number in the wiki page you've created at step 1
See the instructions page for the workflow to implement a development in NEMO.
Staff
Name | Institution | % | Position |
---|---|---|---|
... | ... | ... | ... |
... | ... | ... | ... |
... | ... | ... | ... |
... | ... | ... | ... |
Specific actions
For information, some specific actions are listed as other planned developments coming with additional resources.
CMCC |
CNRS |
Mercator_Océan |
Met_Office |
NOC |
---|---|---|---|---|
|
|
|
|
|