MERCATOR-NEMO team - 2011 actions


Last edited Timestamp?


members

NameInstitution%Position
Clément Bricaud Mercator Océan, Toulouse??Mercator NEMO officer
Yann Drillet Mercator Océan, Toulouse??Mercator Consortium expert
Guillaume Reffray Mercator Océan, Toulouse??Mercator developper
Jerome Chanut Mercator Océan, Toulouse??Mercator developper
Gilles Garric Mercator Océan, Toulouse??Mercator developper
Mondher Chekki Mercator Océan, Toulouse??Mercator developper

total weeks :
??+??+... = ?? wk (40 wk = man/year)

Summary:

ActionBrief descriptionStatusBranch nameTrac ticket n°Wiki page nameReviewer(s)Review statusReady for merge
Mercator-1 Atmospheric pressure: end of 2010 task
Mercator-2 Tidal potential
Mercator-3 Mixed Implicit/Explicit? bottom friction
Mercator-4 PPM advection scheme
Mercator-5 ECUME bulk formulae
Mercator-6 Lagrangian Floats Module improvments
Mercator-7 Online computing of transport across sections
Mercator-8 resolving the 2 versions of time-stepping
Mercator-9 Improvement of OBC
Mercator-10 configuration of NEMO code to the RAPS consortium


MERCATOR.1 — Atmospheric pressure: end of 2010 task

Motivation: Use Atmospheric pressure to add the atm gradient to add inverse barometer to OBC and BDY. running with time-splitting
Status : Running at Mercatoron 2.3; coded in NEMO_3.2 .
main tasks :test on POMME configuration,review and commit.
Principal Investigator : Jerome Chanut (jchanut@…)
Deadline :??
Priority: High
Science Reviewer : Met Office (TBC)
System Reviewer : Met Office (TBC)

Number of weeks : 2


MERCATOR.2 — Tidal potential

Motivation: add tidal potential, add tidal for key_obc case, converge Mercator and Metoffice codes for astronomical functions.
Status : Running on NEMO_2.3 .
main tasks : NVTK, doc,review,commit.
Principal Investigator : Olivier Legalloudec <olegallou@…>
Deadline :??
Priority: High
Science Reviewer : Met Office (TBC)
System Reviewer : Met Office (TBC)
Number of weeks : 3


MERCATOR.3 — Mixed Implicit/Explicit? bottom friction

Motivation: Unconsistent bottom stress in 2d and 3d modes. From BOM code. Explicit bottom stress in barotropic equations/implicit in baroclinic equations. Adapted for tidal configurations.
Status :Running in NEATL36 at Mercator.
main tasks : NVTK, doc,review,commit.
Principal Investigator : Jerome Chanut (jchanut@…)
Deadline : ??
Priority: High
Science Reviewer : Met Office (TBC)
System Reviewer : Met Office (TBC)
Number of weeks : 2


MERCATOR.4 — PPM advection scheme

Motivation: Add another scheme for tracers advection: horizontal part done at Mercator ; vertical part from UkMet? ? .
Status : Running on NEMO_3.2.
main tasks :.
Principal Investigator : Guillaume Reffray (greffray@…)
Deadline : ??
Priority: Low
Science Reviewer : Met Office (TBC)
System Reviewer : Met Office (TBC)
Number of weeks : ??


MERCATOR.5 — ECUME bulk formulae

Motivation: Ability for NEMO to use another bulk formulation for heat, humidity and momentum at the air/sea interface based on multi-campaigns in situ measurements.
Status : Development and phasing with nemo_3.2 OK.
main tasks : NVTK, doc,review,commit.
Principal Investigator : Gilles Garric (ggarric@…)
Deadline :??
Priority: Low
Science Reviewer : Met Office (TBC)
System Reviewer : Met Office (TBC)
Number of weeks : 3


MERCATOR.6 — Lagrangian Floats Module improvments

Motivation: Online monitoring of water particles (position + (T,S) signature), improvements of ascii output + implementation of I/O Ariane (B Blanke) convention: on-mesh initialisation+ netcdf outputs
Status : Working with IOIPSL, not with IOM
main tasks : Phasing with new IOM, NVTK, doc,review,commit.
Principal Investigator : stephane LAW CHUNE (slaw@…)
Deadline :End October 2011
Priority: Low
Science Reviewer : NOCS(TBC)
System Reviewer : NOCS (TBC)
Number of weeks : 1


MERCATOR.7 — Online computing of transport across sections

Motivation: diagnostic
Status : OK for NEMO 3.1
main tasks : review, NVTK, doc and commit
Principal Investigator : Clement BRICAUD (cbricaud@…)
Deadline :???
Priority: Low
Science Reviewer : Met Office(TBC)
System Reviewer : Met Office(TBC)
Number of weeks : 1


MERCATOR.8 — resolving the 2 versions of time-stepping

Motivation: Tracer conservation and time splitting. reference: Shchepetkin, A. F., and J. C. McWilliams?, 2005
Status :Running in NEATL36 at Mercator.
main tasks : Main idea:replace Leapfrog scheme by a Fb tamporal scheme, but keep actual method for updating ssh at 3D time-stepping.
workplan:
1.implementation in NEMO_3.3
2.test some eventual problem of divergence of SSh in barotropic mode compared to SSH in 3d mode ( cf Hallberg and Adcroft, OM 2009: Reconciling estimates of the free surface height in Lagrangian vertical coordinate ocean models with mode-split time stepping).
3.test in high-resolution configuration at Mercator.
4.take a decision for reorganization of step for time-splitting.
Priority: High
Principal Investigator : Jerome Chanut (jchanut@…)
Number of weeks : 4 (TBC)


MERCATOR.9 — Improvement of OBC

Motivation: need to discuss with OBCs' experts of the consortium to organize the work; merge OBC and BDY
Status :
main tasks :
Principal Investigator : Jerome Chanut (jchanut@…)
Priority: High
Number of weeks : 3 (TBC)


MERCATOR.10 — configuration of NEMO code to the RAPS consortium.

Motivation: benchmarking purposes
Status : submitted
main tasks :
Principal Investigator : Mondher Chekki (mchekki@…)
Priority: High
Number of weeks : 1 (TBC)


MERCATOR.11 — User Support

Motivation:Provide support to users of NEMO.
Number of weeks : 2


MERCATOR.12 — Code Reviewing

Motivation:Reviewing code from NEMO partners
Number of weeks : 3


MERCATOR.13 — Beta Testing

Motivation:Beta testing of the next relaese
Number of weeks : 3


MERCATOR.14 — Exchange with others centers

Motivation:System Team meetings, Developers Team meetings,NEMO Users meetings, partcipate to the merge party.
Number of weeks : 3