Changes between Version 8 and Version 9 of 2012WP/2012Action_institutions_LOCEAN
- Timestamp:
- 2011-11-16T09:44:22+01:00 (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
2012WP/2012Action_institutions_LOCEAN
v8 v9 67 67 68 68 === '''LEGI-9 - Development of TAM (continuation)''' === 69 ''' Motivation:''' development of the Tangent and Adjoint Model (TAM) of NEMO.[[BR]] ''' Status :''' Grenoble action (LJK, LEGI, ANR VODA), a 3 year project started in 2008, and well engaged: (1) first release of tangent linear and adjoint model phased with ''' nemo_v3'_3'' ocean dynamics, which includes ORCA2_Z31, GYRE_Z31 configurations, MPP capabilities and documentation; (2) validation tools available (adjoint test, tangent linear hypothesis); (3) coding phase achieved for TAM phased with ''' nemo_v3.2 & nemo_v3.2.1''' (6 wks). [[BR]] ''' main tasks :''' [[BR]] 70 (1) include Grenoble validation tools in the SETTE settings: SETTE workshop required. [[BR]] 71 (2) create tutorial, test cases and reference experiment for Adjoint (4 wks - ''' nemo_v3_3''' ). [[BR]] 72 (3) organise the review cycles for nemotam. [[BR]] 73 (4) validation of 3.3 to be completed. [[BR]] 69 ''' Motivation:''' development of the Tangent and Adjoint Model (TAM) of NEMO.[[BR]] 70 ''' Status :''' Grenoble action (LJK, LEGI, ANR VODA), a 3 year project started in 2008, and well engaged: 71 (1) first release of tangent linear and adjoint model phased with ''' nemo_v3_3''', ocean dynamics, which includes ORCA2_Z31, GYRE_Z31 configurations, MPP capabilities and documentation 72 (2) validation tools available (adjoint test, tangent linear hypothesis); (3) coding phase achieved for TAM phased with ''' nemo_v3.2 & nemo_v3.2.1''' (6 wks). [[BR]] 73 ''' main tasks :''' [[BR]] 74 (1) include Grenoble validation tools in the SETTE settings: SETTE workshop required. [[BR]] 75 (2) create tutorial, test cases and reference experiment for Adjoint (4 wks - ''' nemo_v3_3''' ). [[BR]] 76 (3) organise the review cycles for nemotam. [[BR]] 77 (4) validation of 3.3 to be completed. [[BR]] 74 78 '''Science Reviewer:''' Arthur Vidard [[BR]] 75 79 '''System Reviewer:''' [[BR]]