New URL for NEMO forge!   http://forge.nemo-ocean.eu

Since March 2022 along with NEMO 4.2 release, the code development moved to a self-hosted GitLab.
This present forge is now archived and remained online for history.
2014WP/2014Stream0 – NEMO
wiki:2014WP/2014Stream0

Version 11 (modified by clevy, 10 years ago) (diff)

--

NEMO team Stream 0 - Shared 2014 actions

Last edited Timestamp?

WARNING page currently in progress

Summary:

AGRIF,

Configuration Manager,

Simplification

Wave Coupling...

Action Brief description Status Branch name Trac ticket n° Wiki page name Reviewer(s) Review status Nb of weeks Ready for merge If "NO", reason and status for 2015
AGRIF
AGRIF-1 CNRS - !6:Investing in AGRIF expertise
AGRIF-2 CNRS-3: AGRIF+LIM3
Config. Manager
ConfigMan?-1 MERCATOR 1 Improve first version
ConfigMan-2 INGV-5 - Participate to Config Manager working group
Simplification
Simplification -1 CNRS-12 Lead discussion on code simplification
Wave coupling
Wave-1 INGV-4 Wave-current interaction
Wave-2 Met-Office-18 Inclusion of surface waves in NEMO

AGRIF-1 - (CNRS - 6):Investing in AGRIF expertise

Motivation: Hands on AGRIF for xx test cases. Gathering and sharing expertise. Towards a NEMO-AGRIF tutorial/training course To be elaborated with other System team members in the consortium (making AGRIF compatible with time splitting, free surface, ALE…)
Status : Starting
Main tasks : Using AGRIF, contribute to the shared expertise by building a tutorial/training course
Science Reviewer:
System Reviewer:
Deadline: end 2014
Priority: high
Depends on: system simplification
Principal Investigator : Sébastien Masson

AGRIF-2 - (CNRS - 3): AGRIF+LIM3

Motivation: Test AGRIF+LIM3 in order to suppress LIM2
Status : Starting
Main tasks : Configuration and validation to be defined
Science Reviewer:
System Reviewer:
Deadline: end 2014
Priority: high
Depends on:
Principal Investigator : Simona Flavoni

Simplication-1 - (CNRS - 12):Lead discussion on code simplification

Motivation: following prospective, simplify NEMO's options
Status : Starting
Main tasks : See first proposed list written by Gurvan. To be discussed within System team and during Developers Committee. This action does not designate who will do the practical work…
Science Reviewer:
System Reviewer:
Deadline: end 2014
Priority: high
Depends on: system simplification
Principal Investigator : Gurvan Madec

ConfigMan?-1MERCATOR-1 - Configuration manager

Motivation: Easily manage the set-up of new-configurations.
Status : Preliminary version available in Sept 2013. Fortran routines only.
Main tasks : Develop tools (scripts, Fortran routines, graphical interfaces) to create inputs needed to run a new configuration. Take into account online (AGRIF) or offline nesting. Tasks scheduled in 2014: Debug, Enable creating a configuration around the North Pole, ensure compatibility with existing nesting tools interface. Possible future developments in 2015 and beyond: Vertical remapping (or should it be online ?), Python scripts (?), graphical interface (?)

Science Reviewer: TBD
System Reviewer: TBD
Deadline: Aug 2014
Priority: high
Depends on: xx
Principal Investigator : Julien Paul

ConfigMan? - 2 - INGV-5 Participate to Configuration Manager Working group

Motivation:
Status :
Main tasks :
Science Reviewer:
System Reviewer:
Deadline:
Priority: high
Depends on:
Principal Investigator : Paolo Oddo

Wave-1 - INGV-4 Wave-current interaction

Motivation:
Status : Starting
Main tasks : Lead working group on wave coupling
Science Reviewer:
System Reviewer:
Deadline: end 2014
Priority: high
Depends on:
Principal Investigator : Emanuella Clementi

Wave-2 Met_Office-18 - Inclusion of surface wave effects in NEMO

Motivation: Modifying NEMO SBC to include wave-induced mixing and Langmuir circulation with data obtained from a surface wave model and modifying the equation of motion to include Stokes-Coriolis forcing
Status : Not started
Main tasks : NEMO-side code modifications to read/couple wave fields and modifications in the TKE scheme and dynamics module
Science Reviewer:
System Reviewer:
Deadline: October 2014
Priority: Medium
Depends on: N/A
Principal Investigator : Francois-Xavier Bocquet (francois.bocquet@…)