New URL for NEMO forge!   http://forge.nemo-ocean.eu

Since March 2022 along with NEMO 4.2 release, the code development moved to a self-hosted GitLab.
This present forge is now archived and remained online for history.
DevelopersCommittee/Agenda/2017-06-27 (diff) – NEMO

Changes between Version 34 and Version 35 of DevelopersCommittee/Agenda/2017-06-27


Ignore:
Timestamp:
2017-07-20T17:28:47+02:00 (7 years ago)
Author:
clevy
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • DevelopersCommittee/Agenda/2017-06-27

    v34 v35  
    4040First test cases available in NEMOGCM, so as associated tools to build and use them 
    4141Now need to define the location of all test cases (existing ones build build consortium members, so as future ones coming from the community), so as the acceptable procedure for all to ensure sufficient quality control (including the responsibilities of System Team on one side, and of the developer on the other). 
    42  
     42Interest expressed (by D. Marshall) to start using test cases for students. 
    4343==== Data assimilation and interface () 
    4444Some inputs have been included in the strategy document, but role and perspectives of this working group are unclear for now, after the decision made concerning TAM, so as the leave of Pierre-Antoine Bouttier from his position. 
     
    5050==== TOP (C. Ethé, O. Aumont) 
    5151No new developments for now, but focus on consolidation of modularity with regards to the different BGC models (PISCES, BFM, MEDUSA...) 
    52 A meeting on PISCES development, with representatives of BFM and MEDUSA will take place in PAris beginning of July. Scope of WG may be updated afterwards, so as the corresponding section of NEMO Development Strategy document 
     52A meeting on PISCES development, with representatives of BFM and MEDUSA will take place in Paris beginning of July. Scope of WG may be updated afterwards, so as the corresponding section of NEMO Development Strategy document 
    5353 
    5454==== Sea-ice (M. Vancoppennolle) 
     
    6969The Developer's Committee will write a message to SC (action J. Le Sommer) to try convincing SC to make it open. 
    7070 
    71 Claire Lévy will ensure the draft is complete and fulfils the suggestions and comments of Dev. Committee. AS so, the draft will be considered as approved by Dev. Committee and send (as a draft) to SC for information by end of July. 
     71Claire Lévy will ensure the draft is complete and fulfils the suggestions and comments of Dev. Committee. As so, the draft will be considered as approved by Dev. Committee and send (as a draft) to SC for information by end of July. 
    7272 
    7373 
     
    7575====  Evolutions of Working Groups  
    7676Developer’s Committee to make recommendations for each Working Group by the end of 2017. If relevant, list of new Working Groups to be created, and selection of their members 
    77 *  AGRIF  
    78 * Configuration Manager  
    79 * Robustness and test cases  
     77*  AGRIF: need to find a unique place where tools to set up AGRIF configuration are developed: to be discussed with Configuration Manager and Test cases WGs: need to make one choice between nesting tools (needing update), future configuration manager, or tools build for test cases 
     78* Configuration Manager: Should focus on the tools to set up NEMO configuration only, and define a strategy with existing resources to decide where to drive the future for next generation, starting from SIREN. Same comment as for AGRIF WG 
     79* Robustness and test cases : Very good job to be continued, focusing on the modality to set up for accepting and distributing test cases. Same comment as for AGRIF WG 
    8080* Data assimilation and interface  
    81 * Parametrisation of mesoscale eddies  
    82 Working Group proposes to be disbanded. 
     81* Parametrisation of mesoscale eddies: as suggested by WG, it is now disbanded. 
    8382* TOP  
    8483* Sea-ice  
    85 * Wave coupling 
     84* Wave coupling:  change this WG to air-sea coupling, including waves (aligned with Chapter 9 of Dev. Strategy document). Details of proposal to be presented by E. Clementi during next meeting end of the year 
    8685 
    8786==== First ideas on 2018 Workplan (presented by System Team), and discussion 
     87No time for this point during the meeting, and limited number of ideas from System Team. This point is postponed but list of preliminary ideas  available [attachment:"Ideas for 2018WP.pptx"] here] 
    8888 
    8989=== 5) Review of the role of Developer’s Committee  ===