Version 20 (modified by edblockley, 3 years ago) (diff)

Working Groups

  1. AGRIF WG
  2. REPORT OF THE WORKING GROUP MEETING (January 30, 2014)
  3. REPORT OF THE WORKING GROUP MEETING (March 10, 2017)
  4. Air Sea interactions WG
  5. Configuration Manager WG
  6. How create regional configuration
  7. How Mercator create regional confiuration
  8. How NOC create regional confiuration
  9. How Met Office? create regional confiuration
  10. config manager demonstrator
  11. Proposals to solve some limits
  12. what the config manager could do, with which file and tool
  13. NOC BDY Tools
  14. Assim WG
  15. HPC WG
  16. UPDATED Actions and notes from NEMO HPC working group meeting
  17. Minutes Notes from NEMO HPC working group meeting: 5 Nov 2015
  18. Minutes Draft minutes NEMO HPC working group: 14:30 - 16:00 CET Friday 4th …
  19. Minutes Draft notes from NEMO HPC group meeting 14:00 – 15:30 (CET) on Wed …
  20. Minutes NEMO HPC Working Group - 10 Feb 2016 meeting =
  21. Draft Minutes NEMO HPC WG  Friday 20 May 2016
  22. NEMO HPC meeting on Mixed Precision
  23. Discussion of Development of a mixed-precision option within NEMO. …
  24. Kernel
  25. LIM WG
  26. Meetings of the LIM WG
  27. Sea Ice Working Group (SIWG)
  28. SI3 private wiki
  29. Simplification & Robustness WG
  30. NEMO tangent and adjoint models (NEMO-TAM)
  31. 1 - Reference Manual
  32. 2 - User's Guide (Howtos, F.A.Q.)
  33. 3 - Meeting reports
  34. 4 - Useful links and references
  35. Recommandation for using this section
  36. Compilation of NEMO and NEMOVAR using FCM
  37. Compilation of NEMO and NEMOVAR using FCM
  38. Installation procedures for Mac Intosh? platforms
  39. Installation with g95
  40. Installation with Intel Fortran
  41. 30 April 2009
  42. Compte rendu de la réunion téléphonique VODA du 18/08/2009
  43. Compte rendu de la viso-conférence VODA du 21/09/2009
  44. Compte rendu de la viso-conférence VODA du 12/11/2009
  45. NEMO-TAM Reference Manual
  46. Description of the configuration
  47. How to run this configuration ?
  48. Testing the tangent and adjoint models
  49. Single observation experiment in 3D-Var
  50. Single observation experiment in 4D-Var
  51. Testing
  52. 1 - Adjoint Test
  53. 2 - [wiki:WorkingGroups/TAM/ReferenceManual/testing/tangent Validation of …
  54. Introduction
  55. Tangent and adjoint models (TAM)
  56. NEMO-TAM Reference Manual
  57. 8 - Demonstrators
  58. 1 - …
  59. 2 - [wiki:WorkingGroups/TAM/ReferenceManual/Demonstrators/ORCA2? The ORCA2 …
  60. 3 - [wiki:WorkingGroups/TAM/ReferenceManual/Demonstrators/GYRE? The …
  61. 4 - [wiki:WorkingGroups/TAM/ReferenceManual/Demonstrators/POMME The POMME …
  62. Tangent Approximations
  63. Direct Model Changes
  64. Source code organization
  65. Testing
  66. 1 - Adjoint Test?
  67. 2 - Tangent Test?
  68. Adjoint test
  69. Tangent Linear Validation
  70. HOWTOs
  71. Frequently Asked Questions
  72. TOP Discussion Group (TOP-DG)
  73. Chapter 10 – The biogeochemical component of NEMO TOP interface …
  74. NEMO v3.6 TOP BDY Patch
  75. TOP interface User Quick Guide
  76. NEMO-TOP Developers page
  77. Robustness & Test Cases WG
  78. How to create a TEST CASE: STRATEGY (template test case Equatorial Box)
  79. a detailed TEST CASE: How to run EQUATORIAL BOX
  80. TEST CASE: EQUATORIAL BOX
  81. How to run Equatorial Box :
  82. Liste of experiences :
  83. Example 1: Equatorial box without Coriolis
  84. Example 2: Equatorial box e1, e2 constant values
  85. Example 3: Equatorial box with e1, e2 variables with latitudes
  86. Example 4: Equatorial box with stratification and constant winds
  87. Example 5: Equatorial box stratification and variable wind
  88. Wave Coupling WG

Working Groups

Assimilation

nemo_assim : data assimilation component (Started 2009)

Configuration manager

nemo_ConfigurationManager (Started 2013)

Agrif

nemo-agrif : (Started 2013)

Wave coupling

NEMO Wave Coupling : (Started 2013)

HPC

NEMO High Performance Computing (Started 2014)

Simplification

NEMO Simplification and Robustness (Started 2014)

Robustness & Test Cases

NEMO Robustness & Test Cases (Started 2015)

Sea Ice Working Group (SIWG)

Sea Ice Working Group : (Started 2016)


NEMO-LIM : Work related to LIM (Started 2014)