Changes between Version 7 and Version 8 of DevelopmentActivities/ORCHIDEE-ROUTING


Ignore:
Timestamp:
2020-10-18T15:54:22+02:00 (4 years ago)
Author:
jpolcher
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • DevelopmentActivities/ORCHIDEE-ROUTING

    v7 v8  
    1717  - Need to test/update routing_PP in order to work with the icosaedric grid (especially for the number of neighbours) 
    1818  - Potentially test the "efficiency" of routing_PP with a very large number of processor to gain speed (currently several hours in one node for a regional configuration) 
    19   - Test the impact of the maximum number of HTUs per grid cell on the overall routing scheme   
     19  - Test the impact of the maximum number of HTUs per grid cell on the overall routing scheme 
     20  - The AstroPy spherical geometry package used is probably not the most efficient one. 
    2021 - Routing scheme in ORCHIDEE 
    2122  - NEED to test the intrinsic/numerical properties of the scheme in order to better understand why the results (river discharge for the Amazon river at Obidos) seems to critically depend on the time step in routing and possibly on the number of HTUs per grid box, etc...